HLNEO - Chronology Page
Fulton Road Bridge
The timeline of structures at this location reflects our best information to date and is NOT guaranteed to be complete.
Structure # 1
|
|
Bridge Type: | Concrete Arch |
| Years Existed: | 1932-2007 | |
| Background Information: | The Fulton Road Bridge is a concrete arch bridge that spans Big Creek over the Cleveland Metroparks Zoo. This bridge is 1630 feet long. The bridge was to connect Clevelanders living south of the city to Downtown. The final cost for constructing this bridge was $1,100,000. Mr. Wendell Brown was the consulting engineer. Cleveland’s Historic Bridges: Architectural and Engineering Masterpieces. | |
| MORE INFORMATION |